WELDING
The activity is focused on welding pressure elements along with auxiliary devices and equipment. The scope of material groups includes, among others:

  • 1.1 (np. P265GH)
  • 3.1 (np. P420QH)
  • 4.2 (np. NiCuMoNb5)
  • 5.1 (np. 13 CrMo4-5)
  • 6.4 (np. X10CrMoVNb91)
  • 8.2 (np. TP310HCbN – HR3C)
  • 44 (np. Inconel 626 i 686)
  • Sanicro type composite tubes
SERVICE
Offer in the scope of:

  • Replacement of boiler membrane walls
  • Replacing superheater components
  • Replacement of ducts and auxiliary equipment
  • Prefabrication of steel structures and weldments

Employee sharing:

  • Production: welders, fitters, foremen
  • Supervision: NDT technicians, welders, engineers, construction manager
ZONE 24
Scheduled Outage Management:

  • Ensuring deliveries and services according to the schedule. The company performs work based on health and safety requirements, quality and within the assumed deadline.

Unscheduled Outage Management:

  • Cooperation with the Client and provision of services in the field of diagnosing and removing the consequences of failures in order to restore full functionality.